This large building had to incorporate a crane which ran on rails the length of the building. This required larger steel and footings to support the extra weight. While constructing the footings, the weather was unusually wet for months. The site was situated in an area which did not drain and had tight, challenging soils to complicate matters. We eventually had to remove all the wet soil that would not dry out. We then brought in 40 semi loads of sand to fill in the entire building pad. Once this was accomplished, we were able to continue with construction.